Skip to content
In Practice SeriesProfessional recognition — forthcoming.Account

Unit 04 · Supply chain

Third-party and supply chain resilience

Contracting for security, testing the assurance you are given, and responding when an incident starts at a supplier.

25 min read3 sectionsIntermediate

Learning outcomes

  • Identify the suppliers on whom the scheme's critical functions depend.
  • Specify security requirements that can be contracted and evidenced.
  • Evaluate assurance reports rather than accepting them at face value.
  • Coordinate a response when an incident begins inside a supplier.

Section 1

The outsourced reality

A pension scheme is a small organisation operating a large estate through other people. Administration, actuarial, investment management, custody, communications, printing, data storage and specialist advice are typically delivered by separate firms, several of which rely on subcontractors of their own. The scheme's resilience is therefore the resilience of a chain, and a chain fails at its weakest link.

Two risks deserve particular attention. The first is concentration: where the same provider or the same underlying platform serves a large part of the sector, a single incident becomes an industry event, and the scheme's own contingency may depend on the very supplier that is unavailable. The second is visibility: a sub-processor that prints member letters or hosts a portal may hold the data without ever appearing in the scheme's own records.

Mapping suppliers against the assets from Unit 3 makes the picture usable. For each critical function, record the provider, the data involved, the subcontractors relied on, the assurance obtained, and the exit route if the relationship ends badly.

Key points

  • Resilience is a chain property, not a firm property.
  • Concentration risk can make contingency depend on the failing supplier.
  • Map suppliers to assets, including sub-processors.
Managing service providers and third-party riskSource: The Pensions Regulator

Section 2

Contracting for security

Security obligations that are not written down are not obligations. A workable security schedule names the standard the supplier will meet, the controls it will operate, the assurance it will provide and how often, the incidents it must notify and within what time, the subcontractors it may use and how they are approved, and what happens to the data at the end.

Notification timescales matter more than they appear to. A supplier that will notify 'within five business days' leaves the scheme unable to meet its own 72-hour duty to the Information Commissioner where a personal data breach is reportable. Twenty-four hours for suspected incidents affecting scheme data, with named contacts on both sides and a joint response protocol, is a reasonable starting point.

The schedule should also preserve the scheme's ability to check. A right to audit, a right to receive the supplier's independent assurance report each year, a right to require a remediation plan where exceptions are found, and clarity on who bears the cost of a serious failure are all negotiable — and much easier to negotiate before signature than after an incident.

Key points

  • Name the standard, the controls, the assurance, the notification times and the exit.
  • A five-day notification clause can make the scheme's own 72-hour duty impossible.
  • Right to audit and a remediation obligation belong in the contract.
Supplier security and outsourcing expectationsSource: National Cyber Security Centre

Section 3

Assurance, and incidents that start with a supplier

An assurance report is evidence, not a certificate of safety. Independent reports — an AAF 01/06 report, an ISAE 3402 or SOC 1 report, or an ISO 27001 certificate with its scope statement — tell you what was examined, over what period, against what criteria, and what the examiner found. The value lies in the scope, the exceptions and the period covered, not in the logo on the cover.

Read assurance in three passes. First, does the scope cover the systems and processes that actually serve this scheme, including relevant sub-processors? Second, what exceptions were raised, and what compensating controls operate while they remain open? Third, is the period current, and has anything material changed since? A report covering a different platform, or a period two years old, provides comfort without evidence.

When an incident starts at a supplier, the scheme still owns the consequences. The response needs a single point of contact on each side, an agreed information flow that does not depend on the supplier's account team being available, a joint view of who notifies which regulator, and clarity on who communicates with members. Rehearsing that arrangement once, before it is needed, is worth more than a longer contract.

Key points

  • Read the scope, the exceptions and the period — not the certificate.
  • Sub-processors must appear in the assurance scope.
  • Agree in advance who notifies regulators and who speaks to members.
Assurance reports and the controller–processor relationshipSource: Information Commissioner's Office

Formative

Knowledge checks

Two checks for this unit. Each answer produces developmental feedback; they are not an assessment result and nothing here is graded.

0 of 2 attempted

Knowledge check 1

Formative

A supplier's independent assurance report shows an exception in payment authorisation controls. What is the right board response?

Choose one answer to see developmental feedback. Checks are formative: they are not recorded as an assessment result.

Knowledge check 2

Formative

An administrator's contract promises to notify the scheme of incidents within five business days. Why is this a problem?

Choose one answer to see developmental feedback. Checks are formative: they are not recorded as an assessment result.

Checking your learning record…